22.03.2025 aktualisiert

**** ******** ****
40 % teilweise verfügbar

Project Manager and Product Manager with a lot of common sense and hands on attitude

Berlin, Deutschland
Deutschland
Diplom Wirtschaftsingenieur (FH), Maschinenbaumechaniker
Berlin, Deutschland
Deutschland
Diplom Wirtschaftsingenieur (FH), Maschinenbaumechaniker

Profilanlagen

CV_Tobias_de_Crignis_2025-02-22.pdf

Skills

AutomobilindustrieErdarbeitenFinanzenMaschinenbauMaschinenSachgüterproduktionOrganisationsentwicklungProdukt ManagementÖffentlicher DienstRequirements Engineering
I am an experienced project manager who pushes constantly for completion while keeping the delivery focus on the customer problem to be fixed.

Methodologies and frameworks are vehicles that I pragmatically adapt to the needs of the delivery product and organization to achieve the desired outcome.

I love to be part of the requirements engineering as this is the basis for the scoping of the delivery project for both – customer specific solutions and standardized products. This deep understand of the requirements then also allows the effective problem solving to remove roadblocks.

A strong theoretical background and hands on experience in mechanical engineering and industrial manufacturing allows me to also take over work packages within the delivery scope as well as support other team members if needed. Past projects allowed deep insights in many further verticals and areas like:
  • Automotive
  • Machine tools
  • German public sector
  • Road construction
  • Financial products (EaaS)
  • Organizational development

Looking forward to discussing potential engagements with you!

Erfahrung

Berufserfahrungmehr als 10 Jahre
Freelancer seit2019

Sprachen

DeutschMutterspracheEnglischverhandlungssicherSpanischgut

Projekthistorie

Project Manager

Olympus Winter & Ibe GmbH, Teltow (Berlin)

Pharma und Medizintechnik

>10.000 Mitarbeiter


Planning and leading of a project for the implementation and start-up of a production line for electrosurgical generators.
  • Definition and planning of goals, scope, timing and budget with sponsor and stakeholders
  • Definition of roles required for project team and selection of team members jointly with line managers
  • Presentation of project planning / status in stage / gate review boards to get milestone approvals
  • Orchestration of the execution of defined workpackages – forexample: RfQ of equipment, supplier nomination, equipment installation and qualification
  • Facilitation of meetings and workshops to plan and execute project
  • Escalation of roadblocks and problem solving to resolve issues
  • Stakeholder communication to update on progress, issues and key
    milestones
  • Handson support of project team in execution phase – for example:
    negotiations with potential vendors, installation of equipment and general troubleshooting in execution
Outcomes: Complete equipment installed and operational 2,5 months ahead of schedule. Project still running – start-up of line next step

Consultant

Volkswagen

Automobil und Fahrzeugbau

>10.000 Mitarbeiter

Structuring support for the transformation process from combustion engine development to electric car development (department: R&D Diagnostics @ Engine Control Unit)
  • Identification and quantification (FTE and timing) of work related to combustion engines to be phased out
  • Identification and quantification (FTE and timing) of new work related to electric vehicles
  • Modeling of scenarios (workload versus headcounts over time) to determine a viable transformation process
  • Definition of the final organizational design (structure, roles and number of roles)
  • Visualization of the overall transformation process with supporting data and details for different stakeholders (management, affected department and other departments)
Outcomes: Documents for different stakeholders outlining the new organization’s design and the transformation process including supporting data

Senior Product Manager

relayr GmbH - A Munich Re company

Internet und Informationstechnologie

250-500 Mitarbeiter

Development of a generic (different types of equipment) 'Equipment as a Service' offering for OEMs (equipment financing, performance guarantees, go-to-market support and billing services for variable billing models)
  • Compilation of product roadmap for quarter and year (based on customer feedback, customer pipeline and expert interviews)
  • Pre-sales support in the OEM acquisition process
  • OEM onboarding (leading delivery team for technology)
Outcomes: Product roadmap (quarter / year), 2 OEMs connected and setup on EaaS platform, technical scope of 2 prospects defined

Senior Project Manager

relayr GmbH - A Munich Re company

Internet und Informationstechnologie

250-500 Mitarbeiter

Leading customer projects and project team from point of contract execution to handover to customer support (production phase)
  • Support of sales team in pre-sales phase (scoping for contract and sales presentations)
  • Development of detailed requirements and delivery roadmap jointly with solution architect
  • Planning and tracking of delivery items, their due dates and associated budget; definition and execution of measures in cases of deviations
  • Coordination of an international project team (Germany, Poland USA) with the goal of delivering committed deliverables on time
  • Evaluation (cost, feasibility and timing) and negotiation of change orders requested by customers
  • Presentation of project status in steering committee (relayr and customer senior management)

Project example 1: Development of a predictive maintenance solution for robot welding shops to reduce unplanned downtime and drive OEE
  • Development / configuration of protocol adapters to connect PLC, robot controller and cable sensor to edge gateway
  • Development/training of machine learning model to detect anomalies in robot’s trajectory (ML model running on edge gateway)
  • Configuration of edge–cloud connection for alert and visualization purpose
Outcomes: Running MVP able to detect deviations in trajectory of robots in customer’s test setup

Project example 2: Digitization of grinding machines to enable transparency over machine health, cycle time breakdown and OEE overview
  • Configuration of edge gateway to acquire data needed for OEE calculation, machine health (vibration data) and cycle time breakdown
  • Installation of vibration sensor on machine
  • Configuration of machine learning model to detect anomalies in vibration data (ML model running in cloud)
  • Development of UI to show OEE calculation, cycle time breakdown and anomaly score of vibration data
Outcomes: Production ready solution deployed on 3 assets in field

Project example 3: Equipment as a Service  for laser cutting machines – enablement of Pay-per-Part (billing based on parts cut) plus additional services for consumables and incentivization models (discounts on specific volumes) to drive utilization
  • Configuration of edge gateway to acquire machine live data
  • Development of service to automatically process usage data into invoice data for subsequent accounting processes
  • Design and implementation of user frontend to order parts and see status of already submitted orders
  • Development of backend processes and required technical interfaces to calculate orders (based on geometry file) and transfer orders via cloud MES to machine
Outcome: Production ready solution deployed to 3 machines and user trained

Project Manager

Department of Roads Lower Saxony

Öffentlicher Dienst

1000-5000 Mitarbeiter

Implementation of a software solution to manage roads (data of existing streets, building and refurbishment of streets, budgeting and technical specifications) to replace a legacy solution
  • Gathering and documentation of requirements jointly with users in form of user stories and acceptance criteria
  • Matching of requirements against new software’s standard features to identify delta
  • Definition of delivery roadmap for custom features jointly with software supplier
  • Tracking, testing and approval of deliverables provided by software supplier and communication/tracking of deviations with software supplier
  • Development of data migration concept and matching of specific fields from old system to new system
  • Test of delivered migration scope and documentation, communication and tracking of deviations
  • Reporting of project status to customer
Outcome: Roadmap and migration concept handed over to internal successor to continue implementation

Project Manager

Adler Pelzer Group

Automobil und Fahrzeugbau

5000-10.000 Mitarbeiter

Leading the implementation project of a product lifecycle system to manage product processes and data from ‘supplier nomination’ to ‘end of production’ of tier 1 automotive supplier
  • Facilitation and documentation of cross-functional workshops to develop/define processes and requirements for system implementation
  • Definition of delivery roadmap for custom features jointly with software supplier
  • Tracking, testing and approval of deliverables provided by software supplier and communication/tracking of deviations with software supplier
  • Planning and tracking of delivery items, their due dates and associated budget; definition and execution of measures in cases of deviations
  • Reporting of status (progress, roadblocks and budget) in project steering committee
  • Development of an Adler-Pelzer-specific user handbook (structured by roles and processes) and training plan for roll out
  • Planning and execution of international roll out trainings (Europe, USA and Mexico)
Outcome: PLM system in production and key users of regions Europe, USA and Mexico successfully trained

Project Manager

Adler Pelzer Group

Automobil und Fahrzeugbau

>10.000 Mitarbeiter

Leading automotive OEM projects for tier 1 interior and acoustic parts from supplier nomination to finished production part approval (PPAP).
  • Leading an international (Sweden, Germany, Poland and Czech Republic) and cross-functional (R&D, Industrial Engineering, Quality, Operations and Logistics) team
  • Coordination of the timely delivery of contractually agreed items like drawing and technical documentation, prototype tools and prototype parts, serial tools and serial parts as well as quality and PPAP documents
  • Cross-functional coordination to achieve required delivery dates in order to support OEM’s car builds while maintaining the required cost margin on tools and parts
  • Support of sub-supplier development regarding production part approval (PPAP) of purchased parts in order to achieve OEM’s assembly approval
  • Evaluation, quoting and negotiation of change orders with project team to push OEM for payment of change requests
  • Presentation of program status and part maturity in internal and external stage-gate reviews
Outcome: All parts of program successfully launched in plant and tool payments associated to production part approval received from OEM

Consultant / Project Manager

Tiba Managementberatung GmbH

Sonstiges

50-250 Mitarbeiter

Working on interims project management or project/business process improvement engagements for different customers.

Project example 1: Structuring, coordination and tracking of activities with the goal of stabilizing a recently acquires automotive production plant. Support to finished production part approval for recently launched products and implementation of preventive maintenance.

Project example 2: Support building and operating a project office to schedule and track the progress of development of a new commercial vehicle, build the greenfield factory and launch production.

Project example 3: Support the redesign and documentation of an approval process within a car development process.

Project example 4: Support the redesign and documentation of a process framework for an automotive R&D department. Creation of a handbook describing the process framework.

Diplomand

Trumpf Inc., Farmington (USA)

Industrie und Maschinenbau

>10.000 Mitarbeiter

Final thesis on a real company problem to graduate from university. Investigation of root causes for longer throughput time in assembly / test steps in a laser production process and definition/implementation of measures to eliminate issues.
  • Department: Laser Assembly Shop
  • Title of final thesis: Implementation of 24h throughput time for 2,5kW laser

Intern

Volkswagen de México S.A. de C.V., Puebla (Mexiko)

Automobil und Fahrzeugbau

>10.000 Mitarbeiter

Internship to gain hands on industry experience abroad during university studies.
  • Department: Operational Logistics
  • Development of excel (VBA) based tool to calculate the logistic operators needed for different logistic processes in relation to the cars produced

Zertifikate

PMC Level I

Pragmatic Institute

2023

Professional Scrum Product Owner™ I (PSPO I)

Scrum.org

2022

IPMA Level D

GPM IPMA

2013


Kontaktanfrage

Einloggen & anfragen.

Das Kontaktformular ist nur für eingeloggte Nutzer verfügbar.

RegistrierenAnmelden