Pavel Stastny verfügbar

Pavel Stastny

Software Development Lead / Technical Project Manager / Solution Architect

verfügbar
Profilbild von Anonymes Profil, Software Development Lead / Technical Project Manager / Solution Architect
  • 80992 München Freelancer in
  • Abschluss: Dipl.-Ing(TU)
  • Stunden-/Tagessatz:
  • Sprachkenntnisse: deutsch (Muttersprache) | englisch (verhandlungssicher) | russisch (gut) | tschechisch (Muttersprache)
  • Letztes Update: 25.08.2020
SCHLAGWORTE
PROFILBILD
Profilbild von Anonymes Profil, Software Development Lead / Technical Project Manager / Solution Architect
DATEIANLAGEN
Mein aktuelles CV

Diese Anzeige ist nur für angemeldete Nutzer möglich.

SKILLS
Certificates, licence
•  ZMP-Zentrale Mittelstufenprüfung, C1/C2 Level, Goethe Institut München
•  Scrum Product Owner
 Azure Solutions Architect Expert (ongoing certification process, exam scheduled for 09/2020)

Skills and competences
  • 15+ years of IT software development and integration experiences
  • 10+ years work experience for international companies in Germany/Austria
  • 5+ years experiences with project management and team leading
  • Hands-on experiences with the agile project management
  • Turnaround of failing/troubled SW projects
  • Enterprise IT & Cloud architecture
  • Software Quality & Test Architecture
  • Code reviews and refactoring
  • Programming skills in C++ (10+) ,Java (5+)/, Python/C# (3+)
  • Legacy systems (outdated/obsolete system) modernization
  • Excellent german communication skills (native speaker level C2)
  • Branch experiences in digital manufacturing, 3D printing , space, railways, contactless smart cards ,electronic toll collection, aviation and telecommunication
PROJEKTHISTORIE
  • 06/2020 - bis jetzt

    • Muki Versicherungsverein
    • 50-250 Mitarbeiter
    • Versicherungen
  • PMO for IT Cutover & Migration
  • Participation in PMO activities with the goal of changing the
    legacy inventory management system during the time-critical project
    phase.
    • Business Analysis and project plan for the Cutover / Migration
    • Preparation of the fallback scenarios
    • Administration Jira & Confluence
    • Project reporting automation

  • 01/2020 - 03/2020

    • Scheidt & Bachmann GmbH
  • Cloud Migration Architect

  • Account Based Ticketing (ABT) by using contactless smart cards for  Netherlands Public Transport Operator (PTO) network.
    • Solution to migrate ABT system and modules to the cloud
    • Design and planning new features, acceptance criteria for demo delivery
    • Merging/re-architecting legacy components to the new ABT system

  • 06/2018 - 12/2019

    • EOS GmbH Electro Optical Systems
    • 1000-5000 Mitarbeiter
    • Industrie und Maschinenbau
  • Integration Solution Architect & Trainer
  • Integration of the software platform for the industrial 3D printing of metals and polymers. Support the external partners to integrate the in-house software into a selected 3D CAD or MES system.

    • Design, review and documentation of 3D printer API
    • Design and develop gRPC and REST  API wrapper services
    • Support external CAD partners to use and integration 3D print API
    • Support and architecture of backend/monitoring platform for machines
    • Organizing and providing of training activities

  • 11/2016 - 02/2019

    • Siemens Convergence Creators GmbH
    • 1000-5000 Mitarbeiter
    • Transport und Logistik
  • SW Development Lead / Technical Project Manager
  • Project Power SCOE for powering, monitoring and testing of satellite’s power subsystem, project is part of the Euclid ESA (European Space Agency) mission, launch date is planned for 2020.
     

    • Leading, coordination and driving of the agile team
    • Coordination activities for the full lifecycle of software development
    • Assessment  and design of existing software architecture
    • Definition and verification of requirements
    • Sprint/Tasks planning and assigning
    • Guide a team according to SW development best practices
    • Code review with focus on antipatterns & performace

  • 10/2015 - 10/2016

    • Knorr-Bremse AG
    • 5000-10.000 Mitarbeiter
    • Transport und Logistik
  • Software Development Coordinator / IT Software Architect
  • Project for advanced driver advisory system (DAS) that helps train drivers operates their trains in a smooth and energy-efficient manner. The system communicates with on-board communication units, calculates advices for train driver and sends real-time status information of all subsystems to a back-office.

    • Coordination of the agile (scrum) software development team
    • Cooperation with off-shore and near-shore IT teams (India/Hungary)
    • Design software architecture of on-board/off-board system
    • Member of IT Architecture Board
    • Iteration planning and backlog maintenance
    • Gathering , co-authoring and reviewing customer and tender requirements
    • Definition of user stories and epics for core platform development

  • 03/2015 - 06/2015

    • NXP Semiconductors Austria GmbH,
    • Telekommunikation
  • Smart Mobility Technical Project Manager / System Architect
  • Design system architecture for smart mobility solutions and account based ticketing by using NXP contactless smart card (MIFARE) together with cloud-
    based multi-factor authentication service platform (securekey.com)
    • Design software architecture of the back-end system
    • Review of the customer requirements specification (CRS) document
    • Preparation of the functional requirements specification (FRS) document
    • Project plan with timelines/costs estimation and hiring proposal

  • 05/2012 - 01/2015

    • Kapsch TrafficCom AG
    • Transport und Logistik
  • Technical Project Manager R&D
  • Managing and coordination of R&D (Research and development) team to provide testing tools for roadside and back office tolling systems.
    • Responsibility for the development team and test automation framework
    • Scrum Product Owner
    • Software implementation planning on team level
    • Coordination with TPM-RnD of other involved development teams
    • Assurance that accepted system requirements are of sufficient quality
    • Review R&D requirements and test plans
    • Organizing status meetings and education activities for other departments
    • Elaboration software quality concepts for management (Head of R&D)

  • 06/2011 - 03/2012

    • Becon GmbH
  • Co-founder / Project manager
  • Leading and managing the project Airport DPCS, start-up software solution for the aviation industry based on Eurocontrol specification (www.euro-cdm.org).


  • 09/2007 - 05/2011

    • Munich Airport
  • Senior IT Consultant / IT Architect
  • Project Airport CDM (Collaborative Decision Making) in Munich which was developed and standardized by Eurocontrol within the European Airport Programme.

ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT
D8 (München bevorzugt),D9,D6, Wien, Schweiz.
SONSTIGE ANGABEN


KONTAKTANFRAGE VERSENDEN

Nachricht:

Absenderdaten: