CM

Cesar Morales

verfügbar

Letztes Update: 06.09.2022

Mechanical Engineer, with more than 10 years of experience in the development of Mechanical design

Abschluss: Mechanical Engineer
Stunden-/Tagessatz: anzeigen
Sprachkenntnisse: englisch (gut) | spanisch (Muttersprache)

Skills

AutoCAD, HAP, Plumbing IP3, Ductsizer, ecpas, Excel, Power Point

Projekthistorie

01/2015 - 02/2020
Engineer of Mechanical Systems
EMPRESAS BERN

* Deliver, coordinate, participate and review Adjustment and Balance Tests (TAB) with Sub-
Contractors of Disciplines: Air Conditioning, Basement Ventilation, Elevators and Electric Stairs
and Diesel System for Emergency Generators.

* Inspect the Elevator and Escalator System, verifying that the System complies with the proper
Delivery process and with the National Standards.

a) Project: Town center, Costa del Este, Panama.

Supervisors: Ing. Leonardo Paredes / Ing. José Lopez.

2.- Designer:

* Design of the "Air Conditioning System" for projects:
a) Royal Palm. b) The View. c) Matisse. d) Parkside. e) Green Porta. f) Arcadia.

* Verification of Plans and Installation of the "Air Conditioning System" for projects:
a) Plaza del Este. b) Albrook terraces.

* Design of the "Ventilation System" for projects:
a) Plaza del Este. b) The View. c) Matisse. d) Arcadia.

* Design of the Fresh Air System of the "Crowne Plaza" project.

Supervisors: Architect Erick Aicardi / Engineer Juan Cocio / Architect Patricia Rodríguez.




3.- Budget:
* Manage the Bidding Process of the Cooling and Fuel System of Electric Generators.
a) Project: Town center, Costa del Este, Panama.

* Manage the Bidding Process of the Air Conditioning System for projects:
a) Town Center. b) Bern Business Offices. c) Town Center Sales Room.

Supervisors: Ing. Juan Cocio / Arq. Patricia Rodríguez.

04/2008 - 01/2014
Project Coordinator
Ing; Kaffas Shop Café

Valencia - Venezuela.

1.- Projects Coordinator:

* Review the development and delivery of air conditioning, plumbing and fire extinguishing
designs, for projects:

a) Dealer H Motors Valencia, Venezuela. b) Chevy Express Maracaido Dealer,
Venezuela.
c) Pequiven Morón Building, Venezuela. d) CHIRIKAYE Shopping Center,
Mañongo, Valencia, Venezuela.

Supervisor: Ing. José Alfredo Guerrero.

2.- Designer:
* Design of the Air Conditioning System, Sanitary System (plumbing) and Fire System
for the projects:
a) Hotel Catia La Mar, La Guaira, Venezuela. b) Coca-Cola Femsa Valencia, Venezuela.
c) Burger King The Vineyard Valencia, Venezuela. d) Pequiven Morón Building, Venezuela.
e) Kaffas Shop Café, El Viñedo, Valencia, Venezuela. f) CHIRIKAYEN Shopping Center,
Mañongo, Valencia, Venezuela.

Supervisor: Ing. José Alfredo Guerrero.

3.- Inspection:
* Verify and inspect the air conditioning system for projects:
a) CHIRIKAYEN Shopping Center, Mañongo, Valencia, Venezuela.
b) Coca-Cola Femsa Valencia, Venezuela. c) Burger King El Viñedo Valencia, Venezuela.

Supervisor: Ing. José Alfredo Guerrero.

Reisebereitschaft

Verfügbar in den Ländern Panama
Profilbild von Cesar Morales Mechanical Engineer, with more than 10 years of experience in the development of Mechanical design aus Mechanical Engineer, with more than 10 years of experience in the development of Mechanical design
Registrieren